REO & Default Property Services · Mobile, AL
REO Property Preservation in Mobile, AL
Ethreon performs REO property preservation in Mobile, AL — first-visit secures, lock changes, polycarbonate board-ups, trash-outs and debris removal, grass cuts, winterizations, occupancy and condition inspections, and the maintenance that holds conveyance condition — for servicers, national and regional field service companies, REO listing brokers, asset managers and investors with foreclosed property in Mobile County. The crews are Ethreon's own and local, and the record for each order is a timestamped set of before, during and after photos.
Mobile regulates the board-up material itself. The city's amendment to its property maintenance code says unsecured openings are to be closed with clear or semi-clear polycarbonate at least .177 inch thick, fitted to look like glass, and it bars plywood and particle board on commercial property unless the code official grants a waiver. In November 2025 the city also adopted its own vacant structure registry, limited to vacant commercial buildings inside the Henry Aaron Loop downtown.
The Mobile Market
Mobile's REO mix, Gulf weather and the downtown registry
Mobile County runs from historic downtown buildings and older neighborhoods near the port to suburban subdivisions and industrial waterfront. Downtown, the registry targets commercial buildings, and its definition of a commercial structure is any building used or intended to generate revenue, including one leased to residential tenants.
The Gulf decides much of the work. Direct hurricane exposure means openings on a vacant building have to be closed before a storm, and in Mobile the method the code describes is through-bolted polycarbonate rather than a nailed sheet. Year-round humidity grows mold in a shut house and keeps termites active, so condition inspections here look at crawlspaces and sills, not only roofs and windows.
Winters are mild but not free of freezes, and HUD's Alabama winterization window still opens on October 1 and closes on March 31. Grass is the steadier cost: HUD's Alabama cutting season lasts from March 1 through November 30, and Mobile's own limit is 10 inches, and it applies all the way to the curbline.
Local Rules
The rules that change REO work in Mobile.
Each one is summarized from the source linked under it. Where the city rule is stricter than the investor's schedule, the stricter rule controls.
Polycarbonate board-up method — Sec. 52-1, IPMC 111.2.2
Unsecured windows are closed by internal compression: remove all broken glass and damaged frame, cut the sheeting to the inside of the casing, drill half-inch holes in the four corners, and through-bolt it to two composite cross-beams inside with 3/8-inch corrosion-resistant carriage bolts tightened with a ratchet until the nuts cannot be loosened by hand. Fixed windows with intact glass, or openings where compression is impractical, take 2-inch security-head screws at the corners and every 10 inches. At least one exterior door must still admit authorized persons: a solid-core wood or steel door, or hinged sheeting, padlocked through a hasp whose lock loop is fixed with 3-inch security screws. Waivers are available for physical impracticality, economic hardship or unavailable material.
Mobile City Code, Sec. 52-1 (Municode)Twenty days to close; one year boarded — IPMC 111.2 and 113.1 as amended
A vacant structure that is unfit for habitation but not collapsing can be placarded and ordered closed. If the owner does not close it within 20 days, the city secures it and charges the cost plus an administrative fee as a lien on the real estate. A building boarded up for future repair may stay that way for no more than one year unless the building official approves longer.
Mobile City Code, Sec. 52-1 (Municode)Henry Aaron Loop vacant structure registry — Ordinance 52-046
The registry covers commercial structures vacant for at least six months inside the area bounded by Beauregard, Water, Canal and Broad streets, and its definition of owner includes a mortgage holder or bank. Registration is due within 30 days after a building qualifies as vacant and requires proof of liability insurance, a monitored fire protection system, plumbing that complies or is closed off against rodents and insects, and a maintenance plan. For a building with one to three residential units the fee is $250 the first year, $500 the second, $750 the third and $1,000 after that; a sale does not take a building off the registry.
City of Mobile Ordinance No. 52-046, Chapter 52, Article VIII (Municode)Ten-inch grass and repeat abatement — Chapter 52, Article III
Owners must keep grass and weeds at or below 10 inches out to the curbline, remove clippings, and destroy poison ivy, oak and sumac; the code's definition of owner includes a mortgage holder or bank. City abatement is billed at $0.0125 a square foot with a $125 minimum per lot, $7 a cubic yard of debris and a $50 administrative charge, plus $100 more each time the lot is cut again within 36 months. On a lot abated within the past three years, the code official can declare the nuisance without a council resolution and act 10 days after mailing a letter.
Mobile City Code, Chapter 52, Article III (Municode)From Assignment to Listing
The first 30 days of an REO in Mobile.
- 1
First visit: secure to the city's sheeting method
Change the locks, set the lockbox, and close any broken opening with polycarbonate sheeting rather than plywood. Leave one exterior door that authorized people can open with a key or padlock, as the code requires, and photograph the bolt pattern on each window.
- 2
First visit: check the address against the Loop
If a commercial or mixed-use building sits inside Beauregard, Water, Canal and Broad streets, note the date it went vacant. Six months of vacancy makes it a registry building and the owner then has 30 days to register.
- 3
First week: occupancy
Someone with no claim to a lease can be removed under the Chapter 35-9B affidavit after the notice is posted; anyone presenting a real lease goes through eviction. Every occupancy finding is photographed with the time on it.
- 4
First week: cut to the curb
Mow everything under 10 inches including the strip to the curbline, bag and remove the clippings, and kill any poison ivy or sumac growing on the fence lines, which the code treats as a separate duty.
- 5
Before a storm: walk the openings
When a tropical system is forecast, every board-up is checked for loose bolts and cracked sheeting, and any newly broken window is closed before landfall, with photos for the storm file.
- 6
October 1 onward: winterize
Ethreon typically completes a winterization the day after it is ordered, with photos of the drained system, the antifreeze and the tags left on the fixtures.
- 7
Day 30: look for city notices
A weed declaration is preceded by certified mail at least 30 days before the council hearing and by two signs posted on the lot at least seven days before it. The 30-day visit checks for both and repeats the photo record.
Scope of Work
REO services performed in Mobile.
Priced against the program's allowable schedule and closed in the client's platform format. See every allowable by task.
Initial secure & lock change
First visit after sale or vacancy: rekey or replace locks, lockbox to the client's code, secure every opening.
Trash-out & debris removal
Interior and exterior debris removal measured by volume, with personal property and hazardous items handled to the program's rules.
Winterization
Dry, wet, steam, or radiant procedure, typically next day after the request, each system photographed and tagged.
Grass cut & lot maintenance
Initial and recurring cuts on the investor schedule, or the local ordinance where it is stricter.
Board-up & re-glaze
Openings secured to the investor's specification and to any material the state or city requires.
Occupancy & condition inspections
Dated photo sets from consistent vantage points, so a change between visits is visible.
Damage documentation & bids
Freeze, storm, water, and vandalism findings documented and bid in the client's format.
Conveyance-condition maintenance
Upkeep that holds an FHA-bound property in conveyance condition until it transfers.
Alabama Law
How an Alabama property becomes REO
Alabama forecloses out of court under a power-of-sale clause. Section 35-10-13 requires the sale to be advertised once a week for three successive weeks in a newspaper published in the county where the land lies, giving the time, place and terms of sale. That is a publication schedule, not a total foreclosure timeline, so preservation has to start on the work order rather than on a court date.
The sale does not end the borrower's rights. Under Section 6-5-248(b) the borrower may redeem for 180 days on residential property with a homestead exemption claimed that tax year, and for one year on everything else; on homestead property the period does not begin until a redemption notice is mailed at least 30 days before the foreclosure date, and a mortgage dated before January 1, 2016 keeps the full year. Unauthorized occupants who are not tenants can be removed by affidavit under Chapter 35-9B; tenants and holdover tenants go through eviction under Chapter 9A.
Sources: Code of Alabama § 35-10-13 · Code of Alabama § 6-5-248 · Code of Alabama § 6-5-248.1 · Code of Alabama § 35-9B-2
Coverage Area
Where Ethreon works around Mobile.
Central Alabama, organized by county and expanded by assignment. A property outside this list is a coverage request, not a no — the coverage checker gives a county-level answer.
Statewide: Alabama property preservation
Counties
Jefferson · Shelby · Montgomery · Madison · Mobile · Baldwin · Tuscaloosa · Lee · Morgan · Etowah
Mobile REO FAQ
Questions servicers ask about Mobile.
Does a foreclosed house in Mobile have to be registered?
Only if it is a vacant commercial structure inside the Henry Aaron Loop, which includes a building leased to residential tenants. A single-family REO elsewhere in the city falls outside Ordinance 52-046. Alabama's HB315 does not add a registry either, because its reach stops at Class 1 municipalities.
Can we board a Mobile REO with plywood?
Mobile's code calls for polycarbonate sheeting on unsecured property and expressly bars plywood on commercial property without a waiver. The code official can waive the method for physical impracticality, economic hardship or unavailable material. Ethreon boards to the sheeting method unless the code official approves something else in writing.
If the owner cuts the grass after the council declares a nuisance, is there still a charge?
Yes. If the lot is brought into compliance after the declaration but before a crew is dispatched, it is not cut, but the $50 administrative charge still applies and is collected like the other abatement charges.
Does a sale clear a downtown building off Mobile's registry?
No. A change in ownership does not remove the structure from the registry or restart its exemption periods, and unpaid fees run with the property and can become a lien. An actively marketed building is exempt for up to twelve months.
Can you provide a W-9 and certificate of insurance for a Mobile assignment?
Yes. A W-9 and a COI go out whenever a client asks, so vendor setup for a Mobile file is finished before the first secure.
Reference for Mobile
The detail behind this page.
REO property preservation elsewhere in Alabama: Birmingham · Montgomery · Huntsville · Tuscaloosa · Hoover · Auburn · Decatur · Gadsden
Get in Touch
Let's discuss your property operation needs.
Share your scope, location, timeline, and service requirements. Our team will review your inquiry and respond with the next steps.
