REO & Default Property Services · Decatur, AL

REO Property Preservation in Decatur, AL

Ethreon performs REO property preservation in Decatur, AL — pool and standing-water control, grass cuts, initial secures, rekeys, trash-outs, board-ups, winterizations, occupancy and condition checks, and conveyance-condition upkeep — for field service companies, mortgage servicers, asset managers, REO brokers and investors handling bank-owned property in Morgan County. Ethreon's own local crews carry out each order and close it with timestamped before, during and after photos.

Decatur rewrote its property maintenance code effective January 1, 2026, adopting the 2018 International Property Maintenance Code and striking the language that lets an owner answer a demolition order by boarding the building up for future repair. Its nuisance code is direct as well: a third violation of the same type within two years can bring a summons with no written warning first.

Ethreon's own crews in DecaturTimestamped before, during, after photosWinterization typically next dayW-9 and COI on request

The Decatur Market

Decatur: river-city housing, freezes and repeat violations

Decatur sits on the Tennessee River in Morgan County, with older neighborhoods near downtown and newer subdivisions farther out. Older houses bring crawlspaces and aging plumbing to inspect, and a backyard pool becomes a code problem once its circulation stops.

Freeze events reach north Alabama, so the HUD Alabama window of October 1 through March 31 is a working season here, not a formality. Spring and summer bring the usual Tennessee Valley storms and fast growth; HUD pays for two Alabama cuts a month between March 1 and November 30, and Decatur's own limit is 12 inches.

Repeat violations escalate. Decatur's code makes failure to abate after written notice a misdemeanor, and once the same type of violation occurs a third time within two years the city may issue a summons and complaint without prior notice. An REO with an inconsistent cutting history can reach court quickly.

Local Rules

The rules that change REO work in Decatur.

Each one is summarized from the source linked under it. Where the city rule is stricter than the investor's schedule, the stricter rule controls.

2018 property maintenance code, no board-and-hold — Ordinance 25-4619

Effective January 1, 2026, Decatur adopts the 2018 International Property Maintenance Code with its appendices, names the Community Development Department as the property maintenance inspection department, and sends appeals to the Board of Appeals for Construction Industries. In the demolition section the city deletes the words allowing an owner to board up until future repair and the one-year limit on boarding for future repair, so an order is answered by repair or demolition.

City of Decatur Ordinance No. 25-4619 (Municode)

Weeds, furnishings and stagnant water — Sec. 16-14

Growth other than ornamental plants over 12 inches is a weed nuisance, abated at the cost of the person last assessed for property tax under Act No. 95-500. Discarded furniture, appliances and carpeting may not be kept on residential or commercial property unless housed in an enclosed structure out of public view. Owners must not let stagnant water collect, including in swimming and wading pools without working circulation and filtration. The code's definition of owner includes anyone with a legal or equitable interest.

Decatur Code of Ordinances, Sec. 16-14 (Municode)

Third violation, no warning — Secs. 16-12 and 16-13

Failing to abate a nuisance within the required time after written notice is a misdemeanor, and the city is authorized to perform the abatement itself, charging the cost to the owner as a lien on the property. When the same type of violation recurs a third time or more within two years, the department may issue a summons and complaint without prior written notice.

Decatur Code of Ordinances, Sec. 16-12 (Municode)

What the city will not collect — Secs. 19-7 and 19-18

Debris from building construction, repair or remodeling, dirt, stumps, and limbs four inches or more in diameter are not removed by the city and must be removed privately. Bulky waste the city does take is placed next to the curb or sidewalk, limbs no longer than five feet and no bundle heavier than 75 pounds, and a refrigerator or similar container may not be set out with its snap lock or doors still on unless it can be opened from inside.

Decatur Code of Ordinances, Chapter 19 (Municode)

From Assignment to Listing

The first 30 days of an REO in Decatur.

  1. 1

    First visit: secure for the long haul

    Rekey, install the lockbox and close broken openings. Because Decatur struck board-and-hold as an answer to a demolition order, any significant damage goes into the first report with a repair bid rather than a plan to leave it boarded.

  2. 2

    First visit: check the pool

    A pool without working circulation and filtration is a stagnant-water nuisance in Decatur. The crew drains, treats or covers it on the first visit, photographs the result, and checks the fence and gate.

  3. 3

    First week: cut and clear

    Cut everything under 12 inches, including any right-of-way or easement on the lot, which the city leaves to the owner, and move discarded furniture or appliances off the yard so nothing sits in public view.

  4. 4

    First week: occupancy

    A squatter with no lease is removed through the Chapter 35-9B affidavit after the posted notice; a tenant is removed through eviction. The finding and the posted notice are photographed with the time.

  5. 5

    Trash-out: private haul

    Repair debris, large limbs and anything a paid crew generates are hauled by Ethreon to disposal. Refrigerator doors come off before the unit leaves the property.

  6. 6

    Early October: winterize

    North Alabama freezes make the drain-down urgent. Ethreon typically winterizes the day after the order and photographs the lines, the water heater and the tags.

  7. 7

    Day 30: keep the history clean

    Every visit adds dated photos of the grass height and the yard, because a third same-type violation within two years can bring a summons with no warning.

Scope of Work

REO services performed in Decatur.

Priced against the program's allowable schedule and closed in the client's platform format. See every allowable by task.

Initial secure & lock change

First visit after sale or vacancy: rekey or replace locks, lockbox to the client's code, secure every opening.

Trash-out & debris removal

Interior and exterior debris removal measured by volume, with personal property and hazardous items handled to the program's rules.

Winterization

Dry, wet, steam, or radiant procedure, typically next day after the request, each system photographed and tagged.

Grass cut & lot maintenance

Initial and recurring cuts on the investor schedule, or the local ordinance where it is stricter.

Board-up & re-glaze

Openings secured to the investor's specification and to any material the state or city requires.

Occupancy & condition inspections

Dated photo sets from consistent vantage points, so a change between visits is visible.

Damage documentation & bids

Freeze, storm, water, and vandalism findings documented and bid in the client's format.

Conveyance-condition maintenance

Upkeep that holds an FHA-bound property in conveyance condition until it transfers.

Alabama Law

How an Alabama property becomes REO

Alabama forecloses out of court under a power-of-sale clause. Section 35-10-13 requires the sale to be advertised once a week for three successive weeks in a newspaper published in the county where the land lies, giving the time, place and terms of sale. That is a publication schedule, not a total foreclosure timeline, so preservation has to start on the work order rather than on a court date.

The sale does not end the borrower's rights. Under Section 6-5-248(b) the borrower may redeem for 180 days on residential property with a homestead exemption claimed that tax year, and for one year on everything else; on homestead property the period does not begin until a redemption notice is mailed at least 30 days before the foreclosure date, and a mortgage dated before January 1, 2016 keeps the full year. Unauthorized occupants who are not tenants can be removed by affidavit under Chapter 35-9B; tenants and holdover tenants go through eviction under Chapter 9A.

Sources: Code of Alabama § 35-10-13 · Code of Alabama § 6-5-248 · Code of Alabama § 6-5-248.1 · Code of Alabama § 35-9B-2

Coverage Area

Where Ethreon works around Decatur.

Central Alabama, organized by county and expanded by assignment. A property outside this list is a coverage request, not a no — the coverage checker gives a county-level answer.

Statewide: Alabama property preservation

Counties

Jefferson · Shelby · Montgomery · Madison · Mobile · Baldwin · Tuscaloosa · Lee · Morgan · Etowah

Decatur REO FAQ

Questions servicers ask about Decatur.

Can we answer a Decatur demolition order by boarding the house?

Not under the code in force since January 1, 2026. Ordinance 25-4619 deleted the board-up-for-future-repair option from the demolition section, leaving repair or demolition as the answers.

Is a vacant REO's swimming pool a code problem in Decatur?

It can be. Sec. 16-14 makes stagnant water a nuisance, naming swimming and wading pools unless they have operable circulation and filtration.

Does Decatur always send a warning before citing an owner?

Usually, but not after repeats. Once the same type of violation recurs a third time within two years, the city may issue a summons and complaint without prior written notice.

Does Decatur have a vacant property registry?

HB315 gives it none, since the 2026 act reaches no city below Class 1. Ask the Community Development Department about any local requirement before closing a Decatur file.

Get in Touch

Let's discuss your property operation needs.

Share your scope, location, timeline, and service requirements. Our team will review your inquiry and respond with the next steps.

✓Preservation and field service inquiries
✓Commercial, residential, and institutional property needs
✓Documentation-focused execution and clear communication

Please don't paste any link. Describe your need — we will accept photos or docs in a secured media until we've replied.

We typically respond within 1 business day.

By submitting, you agree that Ethreon may use your information to respond to your inquiry. See our Privacy Policy.