REO & Default Property Services · Hoover, AL
REO Property Preservation in Hoover, AL
Ethreon performs REO property preservation in Hoover, AL — board-ups, lock changes, initial secures, trash-outs, grass cuts, winterizations, occupancy visits, condition inspections and upkeep to conveyance condition — for servicers and asset managers, the field service companies working for them, REO brokers, and investors with bank-owned homes on both the Jefferson County and Shelby County sides of the city. Ethreon's own crews do the work, and the record of each visit is a timestamped before, during and after photo set.
Hoover puts a clock on vacancy. Its amended property maintenance code allows no structure to stay boarded more than six months and treats one boarded longer as unsafe unless the code official waives it, and a building vacant, abandoned or boarded for over six months can be ordered repaired or demolished. Those orders go to every holder of an encumbrance of record, and an owner under a notice may not sell until the buyer has acknowledged it.
The Hoover Market
Hoover's suburban REO and the six-month problem
Hoover's housing is suburban and split between Jefferson and Shelby counties, from established neighborhoods to planned developments such as Riverchase, which has its own regulations appended to the city code. On a Hoover file the risk to watch is a quiet vacancy outlasting the city's six-month limits.
That makes timing the main preservation decision. A broken window boarded on the first visit starts a six-month count, and a resale that takes longer needs glazing restored, or a waiver from the code official, before the board-up itself becomes the violation. Hoover's code also counts a building with its plumbing removed or utilities disconnected among public nuisances.
Weather follows the rest of Central Alabama's severe-weather corridor: tornadoes, straight-line wind and heavy rain, on hilly terrain that turns a downpour into a drainage problem. HUD's Alabama schedules apply: winterize between October 1 and March 31, and cut twice a month from March 1 to November 30.
Local Rules
The rules that change REO work in Hoover.
Each one is summarized from the source linked under it. Where the city rule is stricter than the investor's schedule, the stricter rule controls.
Six months boarded is the limit — IPMC 111.1.1 and 301.3 as amended
Hoover's definition of an unsafe structure includes any structure boarded up for more than six months unless the code official grants a waiver, and the code states that no structure may be boarded longer than that. The amended Section 301.3 also bars maintaining a structure that has been vacant or abandoned, boarded, or out of compliance with the code for more than six months.
Hoover Code of Ordinances, Sec. 6-2.7 (Municode)Repair or demolition orders reach the lender — IPMC 111.4, 113.1 and 113.2
The code official may order a structure repaired or demolished, foundations, porches, steps and walkways included, when it has been vacant or abandoned, boarded or in violation for more than six months. Orders are served on the owner of record, any agent in charge, and the holder of any encumbrance of record, or posted on the main entrance if none can be found. The owner is whoever the current tax rolls list, and a first-class mailing counts as served on the third calendar day inside Alabama and the fifth day outside it.
Hoover Code of Ordinances, Sec. 6-2.7 (Municode)No sale under an open notice without disclosure — IPMC 111.6 as amended
An owner who has received a compliance order or notice of violation may not sell, transfer, mortgage or lease the property until it gives the grantee a true copy of the order or notice and gives the code official a signed, notarized statement from the grantee acknowledging receipt. Each day a violation continues after notice is a separate violation.
Hoover Code of Ordinances, Sec. 6-2.7 (Municode)Yards, sidewalks and discarded items — IPMC 302.1 and 302.4 as amended
Grass and weeds may not exceed 12 inches on the lot, the sidewalk, over the curb or in the abutting right-of-way, and sidewalk noxious matter includes sand, leaves, algae and slippery conditions. Discarded lumber, unused equipment and similar articles may not stay in a yard more than five days, and a discarded refrigerator or freezer with its doors on is an attractive nuisance. After a notice of violation the owner can be prosecuted in Hoover Municipal Court, and the city or its contractor may cut at the owner's cost.
Hoover Code of Ordinances, Sec. 6-2.7 (Municode)From Assignment to Listing
The first 30 days of an REO in Hoover.
- 1
First visit: secure and date every board
Rekey, set the lockbox and board only what is broken. Each board-up is photographed with its date, because that date starts the six-month count Hoover's code applies to boarded structures.
- 2
First visit: occupancy
An unauthorized occupant with no lease can be removed through the Chapter 35-9B affidavit once the notice naming the law enforcement agency is posted. A tenant goes through eviction instead, and a wrongful affidavit is expensive.
- 3
First week: clear the yard inside five days
Remove discarded lumber, old equipment and appliances, take the doors off any refrigerator or freezer before it is hauled, and cut grass and weeds below 12 inches, including the sidewalk edge and the strip over the curb.
- 4
First week: keep the systems in place
Hoover lists a building with its plumbing removed or utilities disconnected among public nuisances, so the condition report records every fixture and meter present, and nothing is stripped during the trash-out.
- 5
Month two onward: plan the glazing
If the house will not sell before the six-month mark, Ethreon bids window replacement on the boarded openings, or the file documents a waiver request to the code official, well before the date arrives.
- 6
From October 1: winterize
Ethreon usually winterizes the day after the order inside HUD's Alabama window and photographs the drain-down and the tags.
- 7
Before closing: hand over any notice
If a notice of violation is open when a buyer is found, the buyer gets a true copy and signs a notarized acknowledgment for the code official before the deed is delivered.
Scope of Work
REO services performed in Hoover.
Priced against the program's allowable schedule and closed in the client's platform format. See every allowable by task.
Initial secure & lock change
First visit after sale or vacancy: rekey or replace locks, lockbox to the client's code, secure every opening.
Trash-out & debris removal
Interior and exterior debris removal measured by volume, with personal property and hazardous items handled to the program's rules.
Winterization
Dry, wet, steam, or radiant procedure, typically next day after the request, each system photographed and tagged.
Grass cut & lot maintenance
Initial and recurring cuts on the investor schedule, or the local ordinance where it is stricter.
Board-up & re-glaze
Openings secured to the investor's specification and to any material the state or city requires.
Occupancy & condition inspections
Dated photo sets from consistent vantage points, so a change between visits is visible.
Damage documentation & bids
Freeze, storm, water, and vandalism findings documented and bid in the client's format.
Conveyance-condition maintenance
Upkeep that holds an FHA-bound property in conveyance condition until it transfers.
Alabama Law
How an Alabama property becomes REO
Alabama forecloses out of court under a power-of-sale clause. Section 35-10-13 requires the sale to be advertised once a week for three successive weeks in a newspaper published in the county where the land lies, giving the time, place and terms of sale. That is a publication schedule, not a total foreclosure timeline, so preservation has to start on the work order rather than on a court date.
The sale does not end the borrower's rights. Under Section 6-5-248(b) the borrower may redeem for 180 days on residential property with a homestead exemption claimed that tax year, and for one year on everything else; on homestead property the period does not begin until a redemption notice is mailed at least 30 days before the foreclosure date, and a mortgage dated before January 1, 2016 keeps the full year. Unauthorized occupants who are not tenants can be removed by affidavit under Chapter 35-9B; tenants and holdover tenants go through eviction under Chapter 9A.
Sources: Code of Alabama § 35-10-13 · Code of Alabama § 6-5-248 · Code of Alabama § 6-5-248.1 · Code of Alabama § 35-9B-2
Coverage Area
Where Ethreon works around Hoover.
Central Alabama, organized by county and expanded by assignment. A property outside this list is a coverage request, not a no — the coverage checker gives a county-level answer.
Statewide: Alabama property preservation
Counties
Jefferson · Shelby · Montgomery · Madison · Mobile · Baldwin · Tuscaloosa · Lee · Morgan · Etowah
Hoover REO FAQ
Questions servicers ask about Hoover.
How long can a Hoover REO stay boarded?
Six months. After that the structure counts as unsafe under Hoover's amended code unless the code official grants a waiver, and the code official can order it repaired or demolished.
Does Birmingham's HB315 registry reach Hoover?
No. The 2026 act is confined to Class 1 municipalities, and Hoover is its own city, not part of Birmingham. Hoover's own leverage is its six-month limits rather than a registration fee.
We have a buyer, but Hoover has issued a notice of violation. Can we close?
Only after the buyer receives a true copy of the notice and the code official receives the buyer's signed, notarized acknowledgment. Section 111.6 bars a sale, transfer, mortgage or lease until both are done.
When is a mailed Hoover notice considered served?
On the third calendar day after mailing if it went to an Alabama address, and the fifth day if it went out of state. The address used is the owner listed on the current tax rolls.
Does the lender get notice of a demolition order in Hoover?
Yes. Orders under the amended Section 113.2 are served on the owner of record and on the holder of any encumbrance of record, so a servicer still holding a recorded mortgage is in the service list.
Reference for Hoover
The detail behind this page.
REO property preservation elsewhere in Alabama: Birmingham · Montgomery · Huntsville · Mobile · Tuscaloosa · Auburn · Decatur · Gadsden
Get in Touch
Let's discuss your property operation needs.
Share your scope, location, timeline, and service requirements. Our team will review your inquiry and respond with the next steps.
