REO & Default Property Services · Lima, OH

REO Property Preservation in Lima, OH

Ethreon performs REO property preservation in Lima, OH — sheeting and lumber board-ups built to the city's specification and replaced with windows and doors on schedule, initial secures, trash-outs, winterizations, lawn cuts, property inspections and conveyance-condition maintenance — for investors, servicers, asset managers and field service firms with REO in Allen County.

Lima treats boarding as temporary by ordinance. Sec. 1816.04 lets no structure stay boarded for more than six months, whoever put the boards up, and then requires the openings to be fixed with the kind of doors and windows the building was designed for. If the city declares the house a public nuisance, its code also restricts how the property can be sold until the order is dealt with.

Ethreon's own crews in LimaTimestamped before, during, after photosWinterization typically next dayW-9 and COI on request

The Lima Market

West-central Ohio housing in Allen County

Lima is the Allen County seat in western Ohio, with older housing shaped by its oil and manufacturing history, and smaller communities such as Delphos, Bluffton and Elida around it. Ethreon covers Allen County within its Northwest Ohio region, alongside Hancock, Putnam, Lucas and Wood.

Open western Ohio ground brings wind and storm damage as well as hard freezes, so the first inspection records roof covering, siding and windows as carefully as the plumbing. Ohio's HUD and USDA freeze season runs from September 1 to the end of April.

Lima's code is direct about what a boarded house must look like: painted sheeting or solid lumber, butted tight, no edge a hand can pull on, fixed so it cannot come off without tools, and loose boards and debris kept off the lot. A board-up that meets that and comes down within six months satisfies the city; one that does not invites a closing order the city can carry out and assess.

Local Rules

The rules that change REO work in Lima.

Each one is summarized from the source linked under it. Where the city rule is stricter than the investor's schedule, the stricter rule controls.

Six months boarded, then conventional openings — and how boards are built

Sec. 1816.04(D) says no structure closed or boarded up, by the city or anyone else, may stay that way longer than six months; after that the openings must be secured by the conventional methods used in the building's design, or methods allowed in new construction of the same type. Sec. 1816.04(E) requires coverings of at least half-inch painted structural sheeting or solid nominal one-inch lumber, closely butted, fitted over the exterior casing or tight inside it over the sash, with no edges or cracks that serve as handholds, anchored by nails or screws and not removable without tools. Decayed porch floors, railings and posts are repaired, and loose debris and discarded lumber kept off the premises. If a vacant unsecured house is not closed after an order — or at once, where it is an immediate danger — the city closes it, and a bill left unpaid for 30 days can go through Council onto the county tax duplicate as a special assessment.

Lima Codified Ordinances Sec. 1816.04

Grass at eight inches, five days after notice

Sec. 1806.09 keeps premises free of grass and weeds above eight inches and of noxious weeds and vines. After notice the owner has five days to cut; if not, the city cuts and bills direct costs, the cost of notices and an administrative fee, collectible on the tax duplicate if unpaid after 30 days. Under Sec. 1806.12, cutting after the notice does not bar prosecution.

Lima Codified Ordinances Secs. 1806.09 to 1806.12

Public nuisances, and the limit on transfer

Lima's General Public Nuisance Code counts as a nuisance any building that is open, vacant or abandoned and unsecured, any premises whose utilities are disconnected or that lacks the required precautions against trespassers, and uncontrolled weeds or grass. Under Sec. 2002.06 an owner served with a public nuisance order may not sell, transfer, mortgage or lease the property until the order is complied with, unless it gives the buyer a true copy of the order and files with the Public Nuisance Administrator the buyer's signed, notarized statement accepting the corrections without condition.

Lima Codified Ordinances Secs. 2002.06 and 2002.08

Ten days to abate, a plan, and a $500 registration

Under Chapter 2008 the Public Nuisance Administrator may order a nuisance abated within 10 days, and within those 10 days the owner may file an abatement plan: rehabilitation that removes every nuisance within three months, a sale through a licensed realtor or weekly newspaper advertising, or demolition under a permit, with one extension of up to three months. A property found to be a public nuisance is registered for $500 with proof of insurance or a bond covering demolition; $250 is refundable on timely compliance, and failing to register draws a $350 civil penalty.

Lima Codified Ordinances, Chapter 2008

From Assignment to Listing

The first 30 days of an REO in Lima.

  1. 1

    Date every board already up

    If the house is boarded when assigned, find out when the boards went on; Lima's six months run from that date, not from the REO. New board-ups are logged with time-stamped photos.

  2. 2

    Board to Lima's specification where boarding is needed

    Painted sheeting or one-inch lumber, butted tight with no handholds, screwed so it takes tools to remove. If the foreclosure record includes a vacant-and-abandoned order, the sheet is a non-plywood material to satisfy R.C. 2308.031.

  3. 3

    Schedule the window and door repair

    Before six months pass, boarded openings are replaced with glazed windows and working doors. Ethreon bids that work with the initial secure so the asset manager can approve both together.

  4. 4

    Cut under eight inches

    The lot is cut at the first visit and kept below eight inches; once notice is served there are only five days, and cutting late does not stop a prosecution.

  5. 5

    Check for a nuisance order before listing

    If a public nuisance order has been served, the house cannot be sold or leased until it is satisfied, or until the buyer receives a copy and a notarized acceptance is filed with the Public Nuisance Administrator.

  6. 6

    Winterize and inspect the envelope

    Winterization usually follows the order by one day between September 1 and April 30, and the same visit records roof, siding and window condition.

Scope of Work

REO services performed in Lima.

Priced against the program's allowable schedule and closed in the client's platform format. See every allowable by task.

Initial secure & lock change

First visit after sale or vacancy: rekey or replace locks, lockbox to the client's code, secure every opening.

Trash-out & debris removal

Interior and exterior debris removal measured by volume, with personal property and hazardous items handled to the program's rules.

Winterization

Dry, wet, steam, or radiant procedure, typically next day after the request, each system photographed and tagged.

Grass cut & lot maintenance

Initial and recurring cuts on the investor schedule, or the local ordinance where it is stricter.

Board-up & re-glaze

Openings secured to the investor's specification and to any material the state or city requires.

Occupancy & condition inspections

Dated photo sets from consistent vantage points, so a change between visits is visible.

Damage documentation & bids

Freeze, storm, water, and vandalism findings documented and bid in the client's format.

Conveyance-condition maintenance

Upkeep that holds an FHA-bound property in conveyance condition until it transfers.

Ohio Law

How an Ohio property becomes REO

Ohio forecloses through the courts, and no statute fixes how long a case takes; that turns on the county docket and whether the borrower contests. The end of the case is fixed: under R.C. 2329.26 the sheriff advertises the sale in a newspaper once a week for at least three consecutive weeks, and the creditor files written notice of the sale with the clerk at least seven calendar days before it. A property the court deems vacant and abandoned under R.C. 2308.02, on clear and convincing evidence of at least three of eleven condition factors, moves to an expedited track: it is offered for sale within 75 days of the order of sale, the mortgagee gains a statutory right to enter and secure it (R.C. 2308.03(A)), redemption rights expire at confirmation of sale (R.C. 2308.03(C)), and plywood may no longer be used to secure it (R.C. 2308.031).

Occupants are removed through forcible entry and detainer under R.C. Chapter 1923. Once the court issues a writ of restitution, the sheriff, bailiff or other officer executes it within ten days (R.C. 1923.14(A)). Ohio has no squatter statute — SB 5 and HB 295 of the 136th General Assembly were not enacted — and R.C. 5321.15 bars a residential landlord from lockouts, utility shutoffs or seizing belongings outside the court process.

Sources: Ohio Revised Code 2329.26 — notice of sheriff's sale · Ohio Revised Code 2308.02 — expedited proceedings for vacant and abandoned property · Ohio Revised Code 2308.03 — entry to secure, and expiry of redemption · Ohio Revised Code 2308.031 — use of plywood prohibited · Ohio Revised Code 1923.14 — execution of the writ of restitution · Ohio Revised Code 5321.15 — landlord self-help prohibited

Coverage Area

Where Ethreon works around Lima.

Northwest Ohio, organized by county and expanded by assignment. A property outside this list is a coverage request, not a no — the coverage checker gives a county-level answer.

Statewide: Ohio property preservation

Counties

Lucas · Wood · Allen · Hancock · Seneca · Sandusky · Erie · Huron · Ottawa · Putnam

Lima REO FAQ

Questions servicers ask about Lima.

Is there a time limit on boarding a Lima REO?

Six months. Sec. 1816.04(D) applies whether the city or anyone else did the boarding, and after that the openings must be repaired with conventional doors and windows.

Can a Lima property under a nuisance order be sold?

Only after the order is complied with, or if the seller gives the buyer a true copy of the order and files the buyer's signed, notarized statement accepting responsibility for the corrections without condition, under Sec. 2002.06.

What does a Lima public nuisance finding cost?

The owner is ordered to abate within ten days and may file a rehabilitation, sale or demolition plan in that time. The property is registered for $500 with proof of insurance or a demolition bond; $250 comes back on timely compliance, and not registering draws a $350 civil penalty.

What grass height does Lima enforce?

Eight inches, under Sec. 1806.09. After notice the owner has five days to cut, and the city's costs, administrative fee included, can be placed on the tax duplicate.

Does Ethreon work outside Lima?

Yes. Allen County and the rest of Northwest Ohio, including Hancock, Putnam, Lucas, Wood and Seneca counties.

Get in Touch

Let's discuss your property operation needs.

Share your scope, location, timeline, and service requirements. Our team will review your inquiry and respond with the next steps.

✓Preservation and field service inquiries
✓Commercial, residential, and institutional property needs
✓Documentation-focused execution and clear communication

Please don't paste any link. Describe your need — we will accept photos or docs in a secured media until we've replied.

We typically respond within 1 business day.

By submitting, you agree that Ethreon may use your information to respond to your inquiry. See our Privacy Policy.