REO & Default Property Services · Alexandria, LA
REO Property Preservation in Alexandria, LA
Ethreon performs REO property preservation in Alexandria, LA — lock changes and rekeys, initial secures, posted no-trespass signage, board-ups, trash-outs, lot clearing and grass cuts, winterizations, condition inspections and conveyance-condition work — for mortgage servicers, field service companies, REO asset managers, brokers and investors in Rapides Parish. The crews are ours and local, and each completed order carries timestamped photographs taken before the work, while it was under way and after.
Alexandria scores its abandoned houses. Community Development ranks each inspected structure from 1 to 5 with a blight score, mails the owner a deficiency assessment, and allows 30 calendar days to respond before the condemnation track begins. The city also tells residents that police can remove vagrants only where a No Trespassing sign or an Uninhabitable Structure Placard is posted. Both facts change what the first visit to an REO has to accomplish.
The Alexandria Market
Alexandria's blight list and the floodplain
The city's own numbers show the scale. Community Development manages a list of more than 600 addresses on any given day, more than 225 of them in the worst rank, and has funding to demolish about 20 to 25 houses a year. Many are heir properties where no succession was opened, so an REO can share a block with a house that nobody is answering for.
About 19 percent of the city, roughly 3,500 of its 18,680 acres, lies in the 100-year floodplain, and so does 54 percent of the five target neighborhoods where the city says blight is concentrated. Low streets and empty neighbors together call for an inspection after heavy rain, not just on the monthly cycle.
Ethreon covers Alexandria and the rest of Rapides Parish within our Central & North Louisiana region, between our Lafayette and Monroe coverage.
Local Rules
The rules that change REO work in Alexandria.
Each one is summarized from the source linked under it. Where the city rule is stricter than the investor's schedule, the stricter rule controls.
Deficiency assessment: 30 calendar days to answer
Under the city's Code Enforcement and Demolition Program guidelines, adopted by ordinance, the owner receives by certified mail the building official's recommendation to rehab or demolish, a deficiency checklist and a Property Compliance Intent Form, and has 30 calendar days to respond. The standard applied is the International Property Maintenance Code and city ordinances. A demolition permit runs 30 calendar days, with up to two 30-day extensions.
City of Alexandria — Code Enforcement and Demolition Program Policy Guidelines (Ordinances #9527-2016, #101-2017, #133-2020)Posted signs decide whether police can act
The city's blight Q&A says the Alexandria Police Department can remove vagrants from an abandoned house when a No Trespassing sign or an Uninhabitable Structure Placard is posted outside; without signage officers can ask people to leave but cannot force them. A placard also means the city has found the building structurally unsafe for anyone to be inside.
City of Alexandria — Common questions about abandoned structures and demolitionCondemnation: ten days' notice, five to appeal
If the owner does not act, the City Council holds a condemnation hearing after at least ten calendar days' notice to show cause by certified mail, and the order is recorded with the clerk of court so it binds later transferees. The owner has five days to appeal the council's decision. After a condemnation order, the city's Q&A says, the owner has 30 days to demolish at its own cost before Community Development begins demolition and files a lien.
City of Alexandria — Code Enforcement and Demolition Program Policy Guidelines, condemnation hearing procedureSanitation will not haul contractor debris
Garbage goes out bagged by 7 a.m. on pickup day only, and a set-out on the wrong day can draw a citation. Limbs and bulky items are collected on a rotation the department aims to run every 10 to 12 working days. Lawn debris put out by a contractor is not picked up, and if the city has to collect it the charge is $300 per load or partial load. White goods must be called in and separated, and concrete is not collected at all.
City of Alexandria — Sanitation (trash pickup)From Assignment to Listing
The first 30 days of an REO in Alexandria.
- 1
Day 1: post signage and secure
Hang No Trespassing signs where they can be seen from the street, rekey, set the lockbox and close every opening. Photograph each sign in place; in Alexandria the sign is what lets police remove someone who comes back.
- 2
Days 1–2: ask whether the city already has a file
Community Development checks each complaint address against its existing files. A deficiency letter mailed to the former owner may already have its 30 days running, and a severity rank tells you how close the house is to the condemnation docket.
- 3
Week 1: occupancy check
Confirm nobody is living there before contents are touched. A prior owner who has stayed is served the written notice to vacate described above; personal property is listed and photographed before removal.
- 4
Week 1: haul the trash-out ourselves
Debris placed at the curb by a contractor is not city collection, and the $300-per-load charge follows if the city takes it. Ethreon loads and disposes of trash-out debris directly and leaves nothing at the curb on an off day.
- 5
Weeks 1–2: lot clearing and first cut
Cut, trim and clear the lot to the HUD Louisiana schedule of two cuts a month between March 1 and November 30. Under R.S. 33:4754, which names Alexandria, unpaid city cutting and cleanup costs can be recorded as a lien.
- 6
Inside 30 days of any deficiency letter: answer it
Return the signed Property Compliance Intent Form with a plan to repair or demolish. A response within the window keeps the file in the owner's hands instead of moving it toward a council hearing.
- 7
Day 30: re-photograph, and winterize from October
Recheck signs, locks and boards. HUD's Louisiana winterization period opens October 1 and runs to March 31; Ethreon typically completes a winterization the day after it is ordered.
Scope of Work
REO services performed in Alexandria.
Priced against the program's allowable schedule and closed in the client's platform format. See every allowable by task.
Initial secure & lock change
First visit after sale or vacancy: rekey or replace locks, lockbox to the client's code, secure every opening.
Trash-out & debris removal
Interior and exterior debris removal measured by volume, with personal property and hazardous items handled to the program's rules.
Winterization
Dry, wet, steam, or radiant procedure, typically next day after the request, each system photographed and tagged.
Grass cut & lot maintenance
Initial and recurring cuts on the investor schedule, or the local ordinance where it is stricter.
Board-up & re-glaze
Openings secured to the investor's specification and to any material the state or city requires.
Occupancy & condition inspections
Dated photo sets from consistent vantage points, so a change between visits is visible.
Damage documentation & bids
Freeze, storm, water, and vandalism findings documented and bid in the client's format.
Conveyance-condition maintenance
Upkeep that holds an FHA-bound property in conveyance condition until it transfers.
Louisiana Law
How a Louisiana property becomes REO
Louisiana allows foreclosure by ordinary or executory proceedings, and executory process is the fast route. The sheriff seizes the property as soon as the writ of seizure and sale arrives, then serves a written notice of seizure; on residential property that notice must carry housing counseling information. The sale cannot be ordered advertised until three days after that notice is served, and the first of two publications must run at least thirty days before the sale, so about thirty-three days from the seizure notice is the statutory floor. No statute sets an overall foreclosure duration; the parish court's docket does.
After the sale, a former owner who stays is an occupant under Code of Civil Procedure Article 4704 and gets a written notice to vacate allowing five days. If that is ignored, a rule to show cause leads to a judgment of eviction, and when it is not obeyed within 24 hours the court issues a warrant that the sheriff, constable or marshal executes in front of two witnesses by clearing the premises. Since Act 652 of 2024, an occupant who stays more than five days after written notice to vacate is also committing criminal trespass under R.S. 14:63.
Sources: La. Code of Civil Procedure art. 2721 — seizure of property; notice · La. Code of Civil Procedure art. 2331 — publication of notice of sale · La. R.S. 43:203 — judicial advertisements, publication · La. Code of Civil Procedure art. 4704 — definitions: lessee, occupant, premises · La. Code of Civil Procedure art. 4733 — warrant for possession · La. Code of Civil Procedure art. 4734 — execution of warrant · La. R.S. 14:63 — criminal trespass; squatters
Coverage Area
Where Ethreon works around Alexandria.
Central & North Louisiana, organized by parish and expanded by assignment. A property outside this list is a coverage request, not a no — the coverage checker gives a parish-level answer.
Statewide: Louisiana property preservation
Parishes
Caddo · Bossier · Ouachita · Rapides · Calcasieu · Lafayette · Iberia · Vermilion · St. Landry · Lincoln
Alexandria REO FAQ
Questions servicers ask about Alexandria.
What does an Alexandria severity rank mean for an REO?
Rank 1, a blight score of 50 to 100, is a burned or collapsed structure needing urgent demolition; rank 2 (35 to 49) has major roof holes, failing structure or broken doors and windows; rank 3 (26 to 34) is cheaper to demolish than repair. Ranks 4 (13 to 25) and 5 (0 to 12) are recommended for rehab or have only cosmetic problems.
How long does an Alexandria demolition permit last, and what does it cost?
The permit costs $50 and is valid for 30 calendar days, which must cover removing all debris. Before it is issued the city confirms with each utility department that service is disconnected, which takes about 10 business days on average.
What happens if demolition debris is left on the lot?
After the permit's 30 days run out, Code Enforcement can arrange removal through Sanitation and lien the owner for the cost, and a litter fee of $500 per day under Section 1.8 of the city code can be charged as well.
Can Alexandria code cases go to a hearing officer?
Act 612 of 2026 added R.S. 13:2575.12, under which administrative adjudication in Alexandria reaches vegetation, nuisance, building-code and zoning ordinances, plus sewerage and drainage rules, and can be extended to other ordinance violations the city designates.
How does the city recover what it spends on a demolition?
It asks the City Council for authority to file a lien for all costs, which is filed against the property's annual city taxes. The owner pays it with the tax bill, or the city is repaid from sale proceeds if the property is sold.
Reference for Alexandria
The detail behind this page.
REO property preservation elsewhere in Louisiana: New Orleans · Baton Rouge · Shreveport · Lafayette · Lake Charles · Monroe · Metairie · Kenner · Slidell · Houma · Hammond
Get in Touch
Let's discuss your property operation needs.
Share your scope, location, timeline, and service requirements. Our team will review your inquiry and respond with the next steps.
